Shower glass: when it goes in and what the tile has to be ready for
Published on: 06/11/2026
Shower glass goes in last, measured off the finished tile. What the walls, the curb or pony wall, the layout and the hardware have to be ready for first.

Shower glass goes in last, measured off the finished tile. What the walls, the curb or pony wall, the layout and the hardware have to be ready for first.

A Certified Tile Installer's honest list of the Boise tile companies worth calling, what each does best, who should call them, and the questions to ask any of them, including us.

A tub-to-shower conversion takes out the tub and builds a shower from the studs and subfloor up. What changes, what moves, and how long the work takes.

Zellige is cut by hand, so no two pieces match. Ceramic subway tile is made by machine, so every piece does. What that changes in look, setting, and cost.